| |
Facility / Event Planning Guide /
1. Facility Descriptions / Measurements / h. Loading Docks
|
View printable version of the EPG Facility Descriptions / Measurements
Loading Docks
A loading dock with ten bays, nine with leveling capacities, is
available for loading and unloading of trucks and other vehicles.
Two loading ramps are also available. The loading dock is on the same
level as the Exhibit Halls; a freight elevator can transport materials
to the Ballroom level. A marshaling yard for oversize vehicles can be made
available; please contact your Event Manager to make arrangements.
Any vehicles under 6'9" must be parked in the parking garage or surrounding
areas. No parking is allowed on the loading dock for any reason and any vehicles
that are not being unloaded or loaded must be removed from the dock. Any vehicle
left unattended will be towed. Loading Dock usage is subject to the Union Rules and
General Conditions provided in this guide.
|
|
Tel: 401-458-6000 • Fax: 401-458-6500 • Email: jmcginn@smgricc.com
One Sabin Street, Providence, RI 02903-1814
|
|
|